Alliant 2 SB is All about Eligibility, Complexity, and Compliance
Alliant 2 SB can make or break a small information technology (IT) service business. Particularly small businesses that do not hold another GSA IT GWAC. The experience based numeric scoring scheme used for Alliant 2 SB looks straight forward and many bidders are saying: "what a relief GSA is not requiring pages of content within the technical approach and management plan." Don't be fooled.
First, eligibility determination is complex and ultimately boils down to management judgement and risk assessment. GSA is planning to award to 80 small businesses and the eligibility requirements will reduce the number of bidders.
Second, the OASIS, HCaTS, and VETS procurements use the same type of GSA's "new way" scoring scheme. Experience with these three procurements shows that the new experience-based scoring scheme can be deceiving. Bidders can be easily tossed out because of non-compliance with the complex file requirements.
The rare bidder with a high potential score can be required to submit up to 50 files using the required RFP formats, each labeled correctly, and placed in the right order within seven (7) volumes. The average bidder will probably submit 30 - 40 files, though fewer, equally cumbersome to manipulate.
Our Alliant 2 Small Business Services are:
- Alliant 2 Model Proposal that allows companies to start now on their teaming arrangements and proposal development. The model includes a model JV and CTA agreements; both compliant with RFP requirements.
- Alliant 2 Model proposal and Full-Service Proposal Writing
- Complimentary expert advice of any aspect of bidding Alliant 2.
This article has been viewed: 3303 times
Rate This Article
Be the first to rate this article